Landivisiau – Equipole
Renewing of one of the two outdoor competition arenas and creation of a riding ring
Considering the shape and soil not easy to maintain, the Equipole competition outdoor arenas were no longer providing the due services expected by the numerous riders in finistere.
It was therefore decided to restore one of them by re-doing the geometry, the soil structure and the watering
At the same time, a very large riding ring was created.
The Equipole is now always full of people and there is an important growing number of events !
In the media
http://equipole-paysdelandi.com/wp-content/uploads/2020/03/cp_inauguration_equipole_fev_2020.pdf
Date
2019
Client
Communauté de Communes du Pays de Landivisiau
Works costs
378 000 €
Companies
Normandie Drainage / Toubin&Clément / Jo Simon